Latest Insights


Huawei makes solar panels in Brno Czech Republic

Huawei makes solar panels in Brno Czech Republic

The had almost two (GW) of capacity at the end of 2010, but installed less than 10 megawatts (MW) in 2011 due to the being reduced by 25%, after installing almost 1,500 MW the year before. Installations increased to 109 MW in 2012. In 2014, no new installations were reported.
Read More Download files
Cadmium telluride solar panel manufacturers

Cadmium telluride solar panel manufacturers

Success of cadmium telluride PV has been due to the low cost achievable with the CdTe technology, made possible by combining adequate efficiency with lower module area costs. Direct manufacturing cost for CdTe PV modules reached $0.57 per watt in 2013, and capital cost per new watt of capacity was about $0.9 per watt (including land and buildings) in 2008.
Read More Download files
ASIMER SOLAR Technical Support Team

24/7 Technical Support

Our certified solar specialists provide round-the-clock monitoring and support for all installed photovoltaic container systems and battery energy storage containers.

Call +34 910 56 87 42

Stay Updated

Subscribe to our newsletter for the latest in photovoltaic container technology, battery energy storage innovations, and industry insights.

Subscribe